scheduling network meaning in Chinese
进度网络
Examples
- The main procedure and steps are following as : according the random characteristic of the time spent by each work procedure , computer simulation is applied to produce the most possible scheduling network . and by corresponding optimization and adjustment on the network , the cost and scheduling construction network can be obtained ; during the practical construction according to the network , the warp between the actual cost and expected scheduling is tracked dynamically . then the computer simulation system is used to predict the future cost and progress operation , and take corresponding precautionary measures to control beforehand
其主要思想与步骤为:首先运用计算机仿真技术来仿真工序作业时间的随机特性,产生概率最大的施工网络计划,并对其进行优化和调整,以获得满足工期、质量要求的成本及网络计划;在施工过程中动态跟踪施工实际成本与进度与目标计划所发生的偏差以及质量问题,然后根据已出现的偏差,利用计算机仿真技术对项目未实施部分进行进度、成本的预测和分析,根据现有信息对网络计划未完成部分进行调整和优化,以尽可能把各项费用控制在预定计划成本之内或使工程的综合指标最优。